I was out at the site this morning. They've done quite a bit since last week: installed some pipe to bring water under the road, finished roughing in the road all the way to the homesite (including the switchback), and cleared a pad for the equipment necessary to drill the well. Today I talked with Louie and Elmo (not kidding) about the perimeters of the homesite, how far to clear, where we'll need backfill, etc. I was there for most of the morning and they made pretty good headway.
First some pics of the road (first looking away from the homesite toward the switchback, then looking up toward the homesite):
Here's what the switchback looks like now v. last week:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment