John was out at the factory today and said things are moving along. All the windows are in and they were getting ready to start the floor and tiling. They've got the box out of the assembly line and into the yard, so the pace of work is no longer dictated by the boxes in front and behind of ours in line. Sounds like they've slowed the pace down a bit to accommodate our concrete hold-up, which is nice. I think they're shooting to finish the box around the first week of June, and to deliver it the second week (after final inspections, punchlist items and signoff).
Should have some pics tomorrow. And Sarah and the boys and I have an appt at the factory next Tuesday afternoon for our first walk through, which should be very exciting. So lots more pics next week.