Tuesday, May 15, 2007

More Factory Pics

Here are the latest pics from the factory. John Kim at Res4 took them during his visit to the factory on Friday, May 11; sounds like they going slow (for them). They were planning on being finished by tomorrow, Wednesday, May 16 - doesn't sound like they will be. That is fine with us, as we could use a little buffer to get our foundation walls up.

Looking from the kitchen toward the entrance door:


From the entrance back toward the kitchen:


The uphill window in the master bedroom:

Architect's fee

So someone has wondered whether paying Res4 an architect fee for what is such a simple design was worth it. I think that person was an architect and was being snide. (And I'm sure Res4 would say "what do you mean, simple?") But I'll answer it because I'm sure other people must wonder the same thing.

I was ambivalent about the return on that 15% in the beginning of this process and I can only say that it was an educated leap of faith. You don't know exactly what you're going to be getting for that money other than what your architect tells you and what you can learn about their process. I was satisfied on both counts before we signed up with Res4 that we were going to get our money's worth, and we have. We've taken up more than our fair share of Res4's time and resources over the last year, and been through quite a few designs (and iterations of this design) to get to where we are today. They've encouraged (and enabled) us to be our own GC. They've been spot on with all cost estimates, and they've delivered what they told us they would. They've more than earned their fee.

But more importantly for us, they were the best option (fee included) for the process we had in mind. We looked at the weeHouse, the LV, MKD, the Empyrean offerings, at stock plans that we could stick build. And at the end of the day, for the house we're getting, at the cost we're getting it for, in the time its taking, Res4 made the most sense for us.

Homesite update and some issues we're dealing with

Yesterday I met with the contractor who's coordinating the set, Mark Wratchford. As you can imagine, West Virginia has its fair share of modular construction, and Mark's been setting traditional modular homes for a while. I met with him last summer before we had even found our land; he spent the day showing me around his various job sites in the Lost River valley (which has a pretty energetic second home boom going on). The guys at Res4 had told us that anyone with a good modular background would probably be good for our job; the trick for them has been finding competent people to do finish work when necessary. Because we've got so little (and such uncomplicated) finish work, the finer points of modern architecture and finish work that can slow a bigger job down shouldn't be too much of a problem (crossing fingers).

We're dealing with lots of little logistical questions at the moment. First, we got the structural engineer's report and third-party stamps a couple of weeks ago. (As I've said, Hardy County has what I'd call a "buy your permit, build your house" ethos when it comes to this process. This is another thing that makes this project a little unique for those trying to learn from our timeline - with a PERC test and a well permit you can get a building permit here; we dug the holes for the PERC last Thursday and expect to have our building permit by the end of next week. And there's no inspection process or certificate of occupancy req't; all this is likely to change as the county reacts to the construction boom.) The original design gave us the option for either block or poured concrete walls for the foundation, and Mark had planned on using block (which his crews can do). But the engineering report, apparently to reduce the complexity of the strap/hinge combination that will tie the box to the foundation, decided we needed to have poured concrete. Since Mark doesn't do the forms, he needs to sub it out and the subs are all booked for a few weeks (again, I imagine this project is unique in that changes like this, though causing a small delay, are not traumatic). So we need to figure out what to do with the manufactured box in the meantime (it's supposed to be delivered around the time the concrete walls will be poured). One option is to park it at the bottom of the road for a week while the concrete cures (not my first choice). Another is to ask the factory to hold it on their end (which is not ideal for them, but probably what will end up happening).

Second, we need to figure out how, when the box is delivered, to get the trailer around the 150 degree hairpin turn on our driveway. That's the scariest thing we're dealing with right now. Bulldozers can do lots of pushing and pulling of trailers, and there are special hydraulic dollies that can move them sideways, but it won't be pretty. And since I'm technically the GC, there's a little question about insurance (and who's responsible for the box from the time it's unhooked from the truck to the time the crane picks it).

Third, how can we minimize the clearing of the site to maintain as much of the trees while still accommodating a crane (which needs a 30'x30' pad below the foundation) and the house, which both Mark and the crane guy want on the other side of the crane? Our road comes into the house on the high side, and these guys want about 50' of room and a road on the low side as well. In our minds, we were imagining a quaint little driveway that bends into the house so you see it all at once. Instead, at the moment we've got a 60' wide road that holds very little in the way of suspense. These are the realities that we are getting used to, and one of the (minor) disadvantages of prefab - you need a bigger envelope than you would if you stick built in the same place (bigger road, bigger clearing for the homesite, etc.).

Today they finished clearing the site and dug the foundation (though I had to head back to DC before they started the hole). Here's where they were when I took off:




And we got a "911 Address" - though we wish they hadn't spraypainted it on the poplar tree:

Monday, May 14, 2007

At the site today

Just a quick post - I'll recap later. But I wanted to put up a couple of pics of the Lost River valley - pretty nice this time of year.





Friday, May 11, 2007

What things cost

While I said when I started this blog that I would be frank about how much everything costs (because that was the info I most wanted to know when I started exploring this process), I've been tardy in getting the numbers up for people to see. That's mostly because we weren't sharing this blog with anybody. But now that we are I need to figure out a way to present what everything has/will cost in a way that makes sense. For now it'll just be in the form of this post. But if anybody has any better ideas about how to maintain such a thing on blogger (or questions about costs I haven't detailed), let me know.

The cabin will be a 3BR 2BA, roughly 2000sf space. Master bedroom, common bath, open kitchen/dining/living space on the upper floor (the factory-manufactured box); 2 bedrooms, common bath, mechanical and rec/media room in the walkout basement (see the May entry on Floor Plans). The walkout wall of the basement will be panelized in the factory (with windows/sliders) and installed by the set crew before the box is set on top. We haven't hired a GC; instead we've hired a very competent excavator to get us up to the site and dig the foundation, and a contractor who has lots of experience doing traditional modular sets and finishes to pour the foundation and coordinate the set. There's not a whole lot of complicated stuff going on here (that's getting done in the factory!), and Res4 (and my contractors) has been really great with guiding us through the process. We've done some significant interior renovations (kitchen, bath, plumbing) ourselves before, but no real construction management competence to speak of. The biggest negative of not having a GC so far has been having to get out to the site often enough (it's a 2-3 hr drive, depending on the time of day).

We hope to do most of the finishing work on site ourselves. That will include installing the cedar siding, building the deck, and finishing out the basement. The skills I'm sure we'll need contractors for are electric, flashing and HVAC; we'll see how the rest goes.

OK - our ballpark budget for the house (excluding land) was about $250K when we started. Our original intention when we first met with Res4 was to put a single bar on concrete piers and be done - a crowded 2BR design was worked out, with minimal site work to speak of. But after walking the site with Res4 and talking it over with them, it made much more sense to do a walkout basement - the construction cost for that kind of space is about half the cost we were looking at out of the factory (which was already very economical at about $150/sf), and we thought the extra space made more sense both for rental and resale purposes (not to mention personal use). So we opened our budget up a bit more, and continue to believe that we can economize with some sweat equity in finishing the basement.

That said, here are our rough numbers so far:

Land: $142K - 30 acres in Lost River, WV;

Prefab Module: $155K - 16'x64' (1024 sf) factory manufactured unit, including all interior finishes except appliances, excluding exterior siding and flashing (*here's a place where soft costs need to be kept in mind - that $155K number INCLUDES tax (which is a tricky thing to figure for the purchase of a prefab module), transportation-related expenses, the structural engineering, third-party stamps/seals, and the panelized front wall of the basement);

Road: $38K - our land was unimproved and getting a road up to the homesite was an exceptional cost for this site, which we knew going in;

Foundation, septic, HVAC, basement wiring and plumbing, well, polished concrete basement floor: $75K (this is still an estimate);

Deck, siding, finishing basement (most of which we hope to do ourselves): unknown, but rough numbers for the materials at this point are around $10k;

Design fee (15% of the rough construction cost of $225K): - $34K.

So the math works out like this - excluding the land and the road, our house cost is less than $275K for just over 2000sf (figure another $40K or so if we had a contractor finish the basement out). That's pretty affordable, as far as we're concerned, for the terrific design and streamlined process that we're getting, and we're thrilled that Res4 has been so close with all the numbers we talked about in the beginning of this process. Long way to go, still, but it's all going to happen very quickly over the next month or so...

Thursday, May 10, 2007

Pics from the factory!!!

So this is what it looks like to have your house built on wheels in a factory! To give you a sense of how quickly this process moves, the factory started framing on Wednesday, May 2. These first four pics were taken on Monday, May 7 (the last one was taken today, Thursday, May 10). They expect to finish (done, ready for first walk through) next Wednesday, May 15.

Exterior from the front:


From the back (you can make out the butterfly of the roof in the left foreground, though it's subtle):


View from the stairs looking toward the kitchen:


From the master bedroom:


Cabinets in the bedroom:

Wednesday, May 09, 2007

Clearing the Homesite

All kidding aside, Louie and Elmo (the bulldozer and excavator operators) really seem to know what they're doing. Both older guys (50s), both chewing dip (and sometimes smoking a cigarette to boot), both been operating these machines in this part of West Virginia since they were teenagers. Not being any of these things, I'm really impressed by the whole process. (Louie actually said today that he'd worked in fish hatcheries as a kid, and wished he'd stuck with it, but was awed by the idea of actually driving a bulldozer. Now his body's tired of it.) They are amazingly precise with these immense pieces of equipment. And there's a lot of thinking that goes into it: we're not trucking all the brush off the site (the excavator is going to take most of the tree trunks - you'll see them stacked in a lot of the pics; they're not mature enough to turn into lumber, so his guys will split them for firewood), so the tops and bottoms of the trees need to get buried. The whole process of building the road was a matter of deciding where to get dirt to replace all the soil that got scooped up with the trees, and where to bury the trees. They map it out before hand, work for a bit, adjust as necessary.

Long story short, they dug a 30' hole today, most of the dirt from which will be used for backfill after the house is set, and they cleared and buried a whole lot of debris. Here are some before, during, and after pics:









Road is roughed in all the way to the homesite

I was out at the site this morning. They've done quite a bit since last week: installed some pipe to bring water under the road, finished roughing in the road all the way to the homesite (including the switchback), and cleared a pad for the equipment necessary to drill the well. Today I talked with Louie and Elmo (not kidding) about the perimeters of the homesite, how far to clear, where we'll need backfill, etc. I was there for most of the morning and they made pretty good headway.

First some pics of the road (first looking away from the homesite toward the switchback, then looking up toward the homesite):





Here's what the switchback looks like now v. last week:



Tuesday, May 08, 2007

Interior Renderings


Exterior Renderings

Here are some renderings from Res4 of what the finished house might look like:





Elevations







Floor Plans

Here are the final floor plans as submitted to the factory (upper and lower):



Saturday, May 05, 2007

DIY

So as we try to figure out where our budget leaves us, and how much of the post-set work we have the time (and competence) to do ourselves, the NYT runs this.

Time for pictures

As most of the process up to this point has not really lent itself to pictures, this blog has been a little wordy. But now we're moving:





Those are from the top of our mostly roughed-in driveway (taken just below the switchback - it's about 1400 feet from the county road at the bottom, and another 200 feet after the switchback up to the homesite). The second pic really gives a sense of how far, and high, it is from the road below.

This road is the most difficult part of this project, I think (of course we haven't had to do anything else yet). It's expensive, it needs to accommodate a 65' long trailer (and a 180 degree turn at that), and it is really big. You don't realize how much you're going to really disturb the land, and how different it's going to look, until it actually happens. This is what the switchback looks like right now:





All the excavators and contractors we've talked to have emphasized how important it is that a road be wide enough that "it can breathe" - get enough sun and warmth that it can dry out when it's wet - and they told us that due to the slope we're going across we need to clear quite a bit just to get a wide enough surface for the road. Seems a little self-serving for them to say that, of course. But everybody on the business end of this project (the Res4 folks included) have consistently told us how strident clients are that nothing get disturbed and how far that is from the reality of construction. Our goal is to have a little house that feels like it's in the middle of the woods - we like that aesthetic enough that we're not even going to clear a site line from the house for a view. But we'll see how close we can get to that...I'll say some more about the realities of clearing the home site and setting a prefab house like this in the next post.

Here are some more pictures from yesterday - first of our boys getting into the spirit, and then the view from a possible hot tub location?!?







Wednesday, May 02, 2007

First Glitch

And a minor one at that, but John from Res4 called yesterday to say that the factory got the wrong size floor trusses. Their usual module size is 14' wide; they also usually use 2x10s as trusses. Res4 designs their boxes with manufactured 2x12 open web trusses. (You quickly begin to see how much of a step outside their comfort zone these different designs are for the factory - not that they can't do it, but that even the littlest tweaks are potential headaches for them.) The factory had apparently framed all the walls and was ready to begin the floor when they realized the webbed trusses were too short; so now they're stuck. If they wait for new trusses to arrive, this spot in the assembly line is stuck - no work for the factory. So Jason Drouse, our factory rep, called me to basically say please allow us to use 2x12s as trusses so we can keep working as scheduled. Not that big a deal to us - we'll have to drill through the trusses now to wire the bottom of the box for basement lights, but Res4 is comfortable that the stability will not be an issue. Much bigger deal to the factory. So we said fine (actually means $1000 or so back to us).